العودة   أكاديمية التدريب الاحترافي > أكاديمية التدريب الاحترافي للمدربين والمدربات والمراكز والمعاهد التدريبية > أكاديمية المعاهد والمراكز التدريبية
 

 
 
أدوات الموضوع انواع عرض الموضوع
  #1  
قديم 06-08-2020, 04:28 PM
امل باشاا غير متواجد حالياً
امل باشاا
الأعضاء
 

افتراضي FIDIC Claims course online

Gentlemen: training Department
The International Training &Consultation Center is pleased to invite you to attend the training program, the information required are in the following:
FIDIC Claims: Management of Claims and Resolution of Disputes
Objectives
• Understand the claim and dispute resolution procedures under FIDIC Conditions of Contract
• Recognize practical issues encountered on projects as to claims and disputes, and how to address those
• Summarize recent FIDIC case law and other authorities as to claims and dispute matters
• Apply practical/hands-on feedback and insights from an experienced FIDIC practitioner and a claims consultant
• Demonstrate the necessary knowledge, advice and insights in order to navigate through the FIDIC claim and dispute provisions on their projects
Course outline
• Introduction to FIDIC
• General Introduction
• Introduction to the FIDIC Contracts
• Managing Variations
• Variations covered by Clause 13 and related clauses
• Definition
• Initiation and instruction of variations
• Role of the Engineer
• FIDIC approach (Construction versus Plant and Design-Build Contract)
• The Management of Claims
• Claims: causes and risks
• Inherent project risks
• Allocation of risks under FIDIC contracts
• Analysis of contractual risk
• Notices and claims procedures
• Clauses requiring notice by the Contractor
• Employer’s/Engineer’s claims (Sub-Clause 2.5)
• Delegation by the Engineer (Sub-Clause 3.2)
• Contractor’s claims (Sub-Clause 20.1)
• Notification of claims
• Contemporary records
• Preparation of claims
• Engineer’s assessment and principles of claim
• Engineers valuation
• Engineer’s determination (Clause 3.5)
• Claims for delay
• Extension of time (Sub-Clause 8.4 and 8.5)
• Force majeure (Sub-Clause 19.4)
• Delay damages
• Claims for additional payment I
• Ground conditions (Sub-Clause 4.12)
• Late possession (Sub-Clause 2.1)
• Breaches of contract
• Employer’s financial claims
• Procedure
• Delay damages
• Defects in works and/or design
• Defects in work and design
• Retention and bonds
• The Responsibilities of the Main Parties
• General Issues
• The Employer
• The Engineer
• The Contractor
• Termination by the Employer
• Suspension and Termination by the Contractor
• Risk and responsibility
• Force majeure
• The Resolution of Disputes
• Dispute Adjudication Board (DAB) principles
• Types of DAB
• Guarantees and general obligations of the DAB
• Nomination of DAB
• Qualifications and selection of members
• Cost and Payments to the DAB
• Dispute Adjudication Board working
• Appointment Failure to agree Referral to the DAB
• Presentation of evidence to the DAB
• The DAB’s decision
• Post-DAB decision processes
• Implementation
• Post-DAB mediation
• Enforcement
• Amicable settlement
• Arbitration
• Arbitrating Claims
• ICC Rules
• Selecting arbitrators
• Use of experts















FIDIC Claims: Management of Claims and Resolution of Disputes

Registration & Contact information
• Please sent confirmation letter for attending, to the following contacts:
amal@itcegy.com
 Amal abdulrhman
 Training Advisor
 00201110056192
If you would like any further information, please don't hesitate to contact me
Training Advisor| amal abdulrhman
Mob| 00201110056192
E-Mail| amal@itcegy.com

With respect






رد مع اقتباس
 

الكلمات الدلالية (Tags)
online course

أدوات الموضوع
انواع عرض الموضوع

تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة

الانتقال السريع

Free counters!